Antunes, R, González, V A, Walsh, K, Rojas, O, O’Sullivan, M and Odeh, I (2018) Benchmarking Project-Driven Production in Construction Using Productivity Function: Capacity and Cycle Time. Journal of Construction Engineering and Management, 144(03).

Atherinis, D, Bakowski, B, Velcek, M and Moon, S (2018) Developing and Laboratory Testing a Smart System for Automated Falsework Inspection in Construction. Journal of Construction Engineering and Management, 144(03).

Castillo, T, Alarcón, L F and Salvatierra, J L (2018) Effects of Last Planner System Practices on Social Networks and the Performance of Construction Projects. Journal of Construction Engineering and Management, 144(03).

Chiang, Y, Wong, F K and Liang, S (2018) Fatal Construction Accidents in Hong Kong. Journal of Construction Engineering and Management, 144(03).

Darwish, M, Elsayed, A Y and Nassar, K (2018) Design and Constructability of a Novel Funicular Arched Steel Truss Falsework. Journal of Construction Engineering and Management, 144(03).

  • Type: Journal Article
  • Keywords: Construction technology; Green construction; Formwork design; Funicular arches; Construction engineering; Steel; Construction materials and methods;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001449
  • Abstract:
    The commercially used systems of formworks and falseworks currently used in construction require high initial cost, take time to be erected, and occupy major space in the construction site. The proposed new system depends on developing a new falsework system depending on the concept of the funicular arch. A parametric study is performed proving that the proposed funicular arched steel truss (FAST) system decreases the own weight of the falsework. FAST was proven to save up to half of the falsework steel in addition to eliminating the need for stringers and therefore decreasing the initial cost compared with commercially used systems. A time study is also performed in order to assess the time efficiency of the construction system, which proved to save two-thirds of the falsework installation time. Further, the new system is proven to be environmentally friendly because it decreases half of the CO2 emitted to air due to steel falsework fabrication in addition to saving transportation time and cost and providing more space in the construction site. A case study is also included in which the soundness of the system is proven from different perspectives.

Huo, T, Ren, H, Cai, W, Shen, G Q, Liu, B, Zhu, M and Wu, H (2018) Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong. Journal of Construction Engineering and Management, 144(03).

Jang, W, Yu, G, Jung, W, Kim, D and Han, S H (2018) Financial Conflict Resolution for Public-Private Partnership Projects Using a Three-Phase Game Framework. Journal of Construction Engineering and Management, 144(03).

Liao, P, Shi, H, Su, Y and Luo, X (2018) Development of Data-Driven Influence Model to Relate the Workplace Environment to Human Error. Journal of Construction Engineering and Management, 144(03).

Shrestha, P and Behzadan, A H (2018) Chaos Theory–Inspired Evolutionary Method to Refine Imperfect Sensor Data for Data-Driven Construction Simulation. Journal of Construction Engineering and Management, 144(03).

Tatum, C B ( (2018) Construction Engineering Research: Integration and Innovation. Journal of Construction Engineering and Management, 144(03).

Tatum, C B ( (2018) Learning Construction Engineering: Why, What, and How?. Journal of Construction Engineering and Management, 144(03).